Our services, in detail

Four stages from roof assessment to a monitored system, with estimates labelled honestly.

Program 01 · The roof decides everything

Roof & shading assessment

A solar array lasts decades and a roof does not. Putting panels on a roof with five years left means removing and reinstalling them later at real cost, so we check the roof first and will tell you to replace it before we quote. Shading is measured on site, not estimated from satellite imagery.

  • Free
  • Homeowners
  • No obligation
  • Roof access

Start this program

Stage 1 · Roof

Age, condition and remaining life.

Stage 2 · Shading

Measured on site across the day.

Stage 3 · Orientation

Pitch and direction assessed.

Stage 4 · Honest answer

Including not yet, or not worth it.

Stage 1 · Your usage

Twelve months of actual bills.

Stage 2 · Sizing

To consumption, not to roof area.

Stage 3 · Modelling

With the assumptions shown.

Stage 4 · Quote

Equipment, warranties and total cost.

Program 02 · Sized to your bills

System design & estimates

Systems get oversized because larger systems pay better commission. We size to twelve months of your actual bills, show the production model with its assumptions visible, and are explicit that it is a model — weather varies, usage changes, and net metering rules are set by policy rather than by us.

  • Per design
  • Homeowners
  • Quoted in writing
  • 12 months of bills

Start this program

Program 03 · Licensed and inspected

Permitted installation

Florida has specific wind load requirements and local authorities inspect for them. Work is done by licensed contractors, permits are pulled, inspections are attended, and penetrations are flashed properly — a leak two years later is the part nobody budgets for and the part that ruins the project.

  • 1 to 3 days
  • Homeowners
  • Included in quote
  • Permit approval

Start this program

Stage 1 · Permits

Applied for before anything is ordered.

Stage 2 · Install

Licensed crews, flashed penetrations.

Stage 3 · Inspection

Local authority sign-off.

Stage 4 · Documentation

Permits and warranties handed over.

Stage 1 · Application

Submitted to the serving utility.

Stage 2 · Approval

Their timeline, honestly stated.

Stage 3 · Commissioning

Tested and energised.

Stage 4 · Monitoring

Underperformance flagged, not ignored.

Program 04 · Not live until approved

Interconnection & monitoring

A system cannot legally be energised until the utility approves interconnection, and that timeline is theirs rather than ours. Afterwards, monitoring matters: a failed optimiser or a shaded string can cost a quarter of production for months before anyone notices from a bill alone.

  • Ongoing
  • Installed systems
  • Included initially
  • Utility approval

Start this program

Wondering whether it is worth it?

A free assessment, and an honest answer — including when the answer is no.